Concrete Column Skip, 2000l
$30.68
$46.63
Concrete Column Skip, 2000l These versatile and robust tremie skips are used in conjunction with a crane to move and pour concrete into formwork on site. Designed to lay horizontally on the ground so that they can be filled from a concrete truck, the bale arm then returns the skip to a vertical position when lifted. The delivery hose enables precise direction of flowing concrete, and the spring retractor automatically closes the discharge gate when pouring is finished. Key features: 3 m of reinforced rubber discharge hose Additional gate closing pulley Heavy-duty kick-down hopper for easier cleaning Tech spec and more info POA Code: 21/840 Categories: Crane Attachments, Cross-Hire, Hire, Lifting & Material Handling Request price
Lifting & Material Handling